T2-3 Live integration test (first end-to-end proof) #9

Closed
opened 2026-09-19 02:10:57 +02:00 by sleepy · 1 comment
Owner

tests/ integration vs real local server: login dev char, assert start, move 1 step (x/y change), attack spawned monster (hp drops), use hp potion. Skips cleanly if AL_TEST_SERVER unset. GATE: must pass. See rust/PLAN.md.

tests/ integration vs real local server: login dev char, assert start, move 1 step (x/y change), attack spawned monster (hp drops), use hp potion. Skips cleanly if AL_TEST_SERVER unset. GATE: must pass. See rust/PLAN.md.
Author
Owner

Merged (PR #27). THE PHASE-2 GATE PASSED: live_integration_gate (login→move 60px→attack (server OK + monster hp 1100→dropped)→use_potion (OK + shared 4s cooldown, 2nd drink guarded)→say) in one session as Rustler. + ReconnectPolicy/RecoveredSession (local-close vs server-drop, backoff+jitter, 11 offline tests) + use_potion. All 3 live tests green.

Merged (PR #27). THE PHASE-2 GATE PASSED: live_integration_gate (login→move 60px→attack (server OK + monster hp 1100→dropped)→use_potion (OK + shared 4s cooldown, 2nd drink guarded)→say) in one session as Rustler. + ReconnectPolicy/RecoveredSession (local-close vs server-drop, backoff+jitter, 11 offline tests) + use_potion. All 3 live tests green.
Sign in to join this conversation.
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
sleepy/adventureland_mongodb#9
No description provided.